The flat spot in the lower right corner is the pool location. |
 |
Me and Aaron grading the pool bottom for the blueboard insulation, two layers = R-20. |
 |
The flat spot in the lower right corner is the pool location now formed up for the slab. |
 |
Pouring the slab for the pool. It has to be as level and flat as possible. |
 |
The slab is poured and now the walls for the pool hole and house are starting up. |
 |
The completed spot for the Endless Pool. |
 |
Gretchen laying out for the mural. |
 |
The mural, we still have to build the columns and arch in front of the mural. This will give it the impression of looking out from inside. |
 |
The steel pool frame. |
 |
Frame assembled and anchored. |
 |
A very happy Gretchen is doing some final tightening on the frame. |
 |
Framing up the outside of the pool, the liner hanger is in place. |
 |
Ready for the bottom felt. |