We get to the prep for concrete on May 17, 2001
The crew at 10:30 pm. Cicely has joined us to help with the framing.
Gretchen running the compactor.
Putting in steel under the thickened slab.
Aerial view of the master bedroom area. The slots in the blueboard are for the thickened slab. The round hole is a point load.
Cicely and Don after finishing the fine grading of the garage floor.
Gretchen and Cicely putting down the vapor barrier under the floor. Friday May 18th
The master bedroom ready for the in-floor heat tubing.
The crew on Sunday, Me, Cicely, Greg, Gretchen, and Trudy.
The concrete truck and the concrete pumper. According to this crew the pumper has largely replaced the wheelbarrow on hilly jobs.
The slab shining in the sun!!!!! Monday May 21, 2001