 |
Washer/dryer room. |
 |
This will become a hallway. |
 |
KK working on the attic. |
 |
KK and Gretchen ready to tear out the last wall...soon to become a much needed closet. |
 |
The washer drain in the lower right was broken, draining water onto the floor for years...and the sewer vent was open in the attic...it did not vent outside. |
 |
Gretchen putting a new vent through the roof. |
 |
KK in the expanded master bedroom closet. |
 |
Count the Cans. |
 |
For the first time the bathroom vents outside! |
 |
Gretchen applying the visqueen. |
 |
I hate this shit... |
 |
With sheetrock comes mudding! |
 |
With mudding comes splatter! |
 |
KK the speed stapler. |
 |
First cut out the inside wall... |
 |
...then cut out the outside wall... |
 |
...then cut out the inside of the wall and take out the old small window... |
 |
...and replace with the new BIG window! (what I learned in house remodeling 101) |
 |
The final window in the office. |